ENGINEERING PROJECTS

Ashworth Road Reconstruction - 19th Street to 23rd Street

EP True Parkway - Bridgewood Boulevard to Wendover Lane

EP True Parkway - Grand Prairie Parkway to Bridgewood Boulevard

Grand Avenue Reconstruction - I35 to S 60th Street

Grand Prairie Parkway & EP True Parkway Intersection Improvements

High Gate Sanitary Sewer

Mills Civic Parkway Reconstruction, South 91st to South Grand Prairie Parkway

Mills Civic Parkway Reconstruction - Sugar Creek & Fox Creek Crossings

Mills Civic Parkway Widening - S 81st St to S 88th St

Valley Junction Alleys - Phase 9

WRA Sugar Creek Improvements - Phase 2

6th Street Parking Lot & Dumpster Enclosure

68th Street & Beechtree Drive Traffic Signal and 50th Street & Dakota Drive Pedestrian Hybrid Beacon

2025 HMA Resurfacing Program - Phase 1

2025 HMA Resurfacing Program - Phase 2

2025 PCC Patching - Phase 1

2025 Sewer Cleaning and Televising Program

2025 Street Reconstruction Program (Giles Street, Valley West Drive to 32nd Street)

2024-2025 Median Renovations

2024 Channel Repair Program

2024 PCC Patching - Phase 2

2024 Sewer Manhole Rehabilitation

Engineering Services YouTube Channel - Drone videos of construction projects

 Project  Information Updated
ashworth road reconstruction - 19th Street to 23rd street
Estimated Start: Spring 2026

Estimated Completion: Spring 2027

Consultant: Shive-Hattery, Inc.

Contractor: TBD

 

Project Overview: This project consists of reconstruction of Ashworth Road generally from the north leg of 19th Street to the north leg of 23rd Street. The roadway cross section will consist of two 11-foot through lanes, one 12-foot two-way left turn lane, and one 11-foot dedicated right turn lane in both eastbound and westbound directions with a 1-foot offset to curb. The 19th Street intersection will be shifted approximately 2 feet north and the 22nd Street intersection will be shifted approximately 2 feet south resulting in a 4-foot lane shift between these two major intersections. Sidewalks will generally be 9.5 feet from back of curb where right turn lanes are not planned (similar to existing) and will generally be 7.5 feet from back of curb where right turns lanes are planned. The project will also include watermain replacement along the north side of Ashworth Road from 20th Street to 23rd Street.

 

Project Status: Utility relocations (electric, gas, telecommunications, etc.) have commenced and will likely be complete by the end of the 2025 calendar year.

 

Vicinity Map of Project

Drone flyover of the Project

 09/02/2025
EP true parkway - bridgewood boulevard to wendover lane
Estimated Start: Summer 2025

Estimated Completion: Fall 2026

Consultant: McClure Engineering Company

Contractor: McAninch Corporation

 

Project Overview: This project consist of construction of EP True Parkway from Bridgewood Boulevard to Wendover Lane. Planned development east of Grand Prairie Parkway is necessitating the construction of EP True Parkway (minor arterial street classification) from Grand Prairie Parkway to Wendover Lane. The construction of the eastern phase of WP True Parkway from Bridgewood Boulevard to Wendover Lane will include 2,400 feet of 3-lane urban cross section (ultimate 5-lane cross section) with one lane in each direction and a continuous left turn lane in the center. The project will also include new watermain, a shared-use path, and fiber conduit along EP True Parkway. 

 

Project Status:  The contractor is currently installing the water main and storm sewer. 

 

Vicinity Map of Project

Drone flyover of the Project

10/28/2025
EP True Parkway - Grand Prairie Parkway to Bridgewood Boulevard Estimated Start: Summer 2025

Estimated Completion: Fall 2026

Consultant: McClure Engineering Company

Contractor: McAninch Corporation

 

Project Overview: This project consists of construction of EP True Parkway from Grand Prairie Parkway to Bridgewood Boulevard. Planned development east of Grand Prairie Parkway is necessitating the construction of EP True Parkway (minor arterial street classification) from Grand Prairie Parkway to Wendover Lane. The construction of the western phase of EP True Parkway from Grand Prairie Parkway to Bridgewood Boulevard will include 3,900 feet of 5-lane urban cross section with two lanes in each direction and a continuous left turn lane in the center. No median will be constructed initially with this project. The project will also include new watermain, a shared-use path, and fiber conduit along EP True Parkway.  

 

Project Status: The contractor is currently installing the water main and storm sewer.

 

Vicinity Map of Project

Drone flyover of the Project

10/28/2025
grand avenue reconstruction - i-35 to S 60th Street Estimated Start: Spring 2025

Estimated Completion: Summer 2026

Consultant: Kirkham Michael

Contractor: Concrete Technologies, Inc.

 

Project Overview: Reconstruction of Grand Avenue from I-35 to South 60th Street from an existing 3-lane undivided roadway to a 6-lane divided roadway, including a trail along the south side of the roadway.

 

Project Status: Traffic has shifted to the newly constructed south lanes of Grand Avenue. The Grand Avenue intersection with Raccoon River Drive will remain open throughout construction. DMACC’s access to Grand Avenue has been closed as well as the Glen Oaks Drive connection to Grand Avenue. Removal of the existing northern lanes has been completed. Installation of the watermain and storm sewer will begin the week of November 10th.  Paving of the new northern lanes will take place in the Spring. The project will be halted for the Winter once work is no longer able to occur due to winter weather conditions with work resuming again in the Spring. 

 

Vicinity Map of Project

Drone flyover of the Project

11/12/2025
Grand prairie Parkway & Ep true parkway intersection improvements Estimated Start: Summer 2025

Estimated Completion: Spring 2026

Consultant: Foth Infrastructure & Environment

Contractor: Concrete Technologies, Inc.

 

Project Overview: This project consists of improvements to the Grand Prairie Parkway & EP True Parkway Intersection.  Planned development east of Grand Prairie Parkway is necessitating the construction of EP True Parkway from Grand Prairie Parkway to Wendover Lane. Improvements to Grand Prairie Parkway will include the construction of the remaining three (3) northbound lanes from EP True Parkway to the I-80 interchange, as well as the necessary northbound and southbound left turn lanes and connection to EP True Parkway. Grand Prairie Parkway will transition back to a 3-lane cross section just south of the intersection until such time that traffic volumes warrant widening of the roadway to Mills Civic Parkway. The project will also include a new traffic signal and accommodate a new watermain and shared-use path along EP True Parkway.  

 

Project Status: The contractor has completed pavement removals, water main installation, storm sewer instillation, and subgrade work on the east side of Grand Prairie Parkway. The intersection has been paved on the east side and construction has started on the west side of Grand Prairie Parkway. 

 

Vicinity Map of Project

Drone flyover of the Project

11/12/2025
high gate sanitary sewer
Estimated Start: Summer 2025

Estimated Completion: Fall 2025

Consultant: Veenstra & Kimm, Inc.

Contractor: Evolution Contracting

 

Project Overview: The project consists of the extension of 2,266 linear feet of 12-inch sanitary sewer through the Sunset Ridge subdivision to serve the proposed High Gate development (name subject to change), including excavation, backfill, connections to existing sewers, surface restoration, traffic control, and other related work.  

 

Project Status: This project is substantially complete. The contractor will continue restoration on the project site.  

 

Vicinity Map of Project

07/23/2025
mills civic parkway reconstruction, South 91st to south grand prairie parkway Estimated Start: Spring 2025

Estimated Completion: Fall 2026

Consultant: McClure Engineering Company

Contractor: Alliance Construction

 

Project Overview: This project includes the reconstruction of Mills Civic Parkway from South 91st Street to South Grand Prairie Parkway from an existing paved 2-lane rural roadway cross section to a 3-lane urban roadway cross section. The initial reconstruction will include the southern three lanes (future eastbound lanes) with grading to accommodate the future widening of the northern three lanes (future westbound lanes) of the ultimate 6-lane divided urban cross section (major arterial classification).  The existing 2-lane roadway will be utilized as much as possible throughout the reconstruction process but ultimately will be removed with this project.  The project will include a shared use path on the south side of the roadway as well as fiber conduit network expansion in the area.  Mills Civic Parkway will be closed to thru traffic for up to 90 days while the new pavement tie-in connections are made at each end of the project.  Stagecoach Drive from South 88th Street to South Grand Prairie Parkway will be utilized as the detour route during this time. 

 

Project Status: Grading, earthwork, and storm sewer installation is complete. The contractor is currently subgrading the site. Paving will take place in the Spring.

 

Vicinity Map of Project

Drone flyover of the Project

11/12/2025
mills civic Parkway Reconstruction - sugar creek & fox Creek Crossing Estimated Start: Summer 2024

Estimated Completion: Summer 2025

Consultant: McClure Engineering Company

Contractor: McAninch Corporation

 

Project Overview: Construction of new a Sugar Creek bridge, new Fox Creek culvert, and Sugar Creek bank stabilization as part of the Mills Civic Parkway Reconstruction from South 91st Street to SGPP (South Grand Prairie Parkway). Construction of the bridge will accommodate initial reconstruction of the southern 3 lanes only. The remainder of the Mills Civic Parkway Reconstruction will be addressed on another project.

 

Project Status:  This project is substantially complete. The contractors are working on final punch list items and restoration is ongoing.

 

Vicinity Map of Project

Drone flyover of the Project

11/12/2025
mills civic parkway widening - s 81st street to s 88th stREET Estimated Start: Spring 2025

Estimated Completion: Summer 2026

Consultant: HR Green, Inc.

Contractor: All Star Concrete

 

Project Overview: Widening of Mills Civic Parkway from South 81st Street to South 88th Street from an existing 3-lane configuration to the planned ultimate 6-lane divided configuration with a median. The Project will be broken into 6 different stages, with some stages being worked on simultaneously. 

 

Project Status: The contractor has completed installing the storm sewer between south 81st Street and south 85th Street and paving of this section continues. Concrete placement between South 88th Street and South 85th Street has been completed. 

 

Vicinity Map of Project

Drone flyover of the Project

11/12/2025
Valley Junction Alleys - Phase 9 Estimated Start: Summer 2025

Estimated Completion: Fall 2025

Consultant: HR Green, Inc.

Contractor: MPS Engineers

 

Project Overview: Phase 9 includes the paving of Valley Junction Alleys in the 500 Block (Locust Street to Vine Street) between 4th-5th Street that previously had storm sewer improvements completed on it and falls within a commercial area (Priority 1). The project will also include the paving of Valley Junction Alleys in the 100 Block (Railroad Avenue to Maple Street) between 1st-2nd Street and 2nd-3rd Street that previously had some, but not all, storm sewer improvements completed on them and fall within a residential area (Priority 2). Each alley closure shall be limited to a consecutive four (4) week period. No more than one (1) alley may be closed at a time, excluding restoration. Work must be completed on an actively closed alley before proceeding to close the next alley, unless sufficient progress is being made.  

 

Project Status: This project is substantially complete. The contractors are working on final punch list items and restoration is ongoing. 

 

Vicinity Map of Project

11/12/2025
WRA Sugar Creek Improvements - Phase 2 Estimated Start: November 2024

Estimated Completion: February 2026

Consultant: Snyder & Associates

Contractor: Iowa Earth Work

 

Project Overview: This is a Des Moines Metropolitan Wastewater Reclamation Authority (WRA) project within The City of West Des Moines. This project involves restoration and stabilization of Sugar Creek between Mills Civic Parkway and Stagecoach Drive. The improvements include shaping stream banks to milder stable slopes, removal of trees within this grading area, installing significant amount of rock to protect the bank from erosion, establishing native vegetation to reduce erosion and enhance water quality benefits, planting trees where feasible in the upper portion of the stream corridor, raising a couple of sanitary manholes to grade, and removal/abandonment of a couple of water wells. 

 

Project Status: This project is substantially complete. The contractors are working on final punch list items and restoration is ongoing. 

 

Vicinity Map of Project

Drone flyover of the Project

11/12/2025
6th street parking lot & Dumpster Enclosure
Estimated Start: Summer 2025

Estimated Completion: Fall 2025

Consultant: HR Green, Inc. 

Contractor: Shekar Engineering

 

Project Overview: This project consists of construction of a new public parking lot (38 stalls) on the City-owned properties at 329-333 6th Street, including a new dumpster enclosure for a new consolidated waste location identified in Valley Junction. The City purchased the property at 329 6th Street and removed the house and detached garage from the property in 2023 in anticipation of this project. The property at 333 6th Street is vacant. The parking lot will include storm sewer drainage, new public parking sign, landscaping, and site lighting similar to other parking lots in Valley Junction.

 

Project Status: Paving of the parking lot is complete. Pavement markings and streetlight installation is ongoing. Construction of the dumpster enclosure has begun. 

 

Vicinity Map of Project

11/12/2025
68th Street & Beechtree drive traffic signal and 50th street & dakota drive pedestrian hybrid beacon
Estimated Start: Summer 2025

Estimated Completion: Fall 2025

Consultant: Snyder and Associates

Contractor: Kline Electric, Inc. 

 

Project Overview: The project includes the installation of a new traffic signal at the intersection of 68th Street & Beechtree Drive, including all of the necessary improvements to accommodate pedestrian traffic at the intersection. The project is being closely coordinated with the Jordan Creek Town Center. The project also includes the installation of a Pedestrian Hybrid Beacon (PHB) at the 50th Street & Dakota Drive intersection. A PHB is a type of traffic control that provides pedestrians with a protected “walk” phase at a Crosswalk. Overhead beacons stay dark until a pedestrian pushbutton is actuated. The beacons then stop traffic and give a “walk” indication to the pedestrian, before returning to dark phase. There are six (6) PHBs currently in use in West Des Moines at 65th Street & Ashworth Road, South 50th Street & Wistful Vista Drive, 78th Place & EP True Parkway, 39th Street & EP True Parkway, 41st Street & Mills Civic Parkway and 52nd Street & EP True Parkway.

 

Project Status: The traffic signal at 68th Street and Beechtree Drive was activated on November 6th. The Pedestrian Hybrid Beacon at 50th Street and Dakota Drive is expected to be activated the week of November 10th. Restoration is ongoing at both locations. 

 

Vicinity Map of Project

11/12/2025
2025 HMA Resurfacing Program - Phase 1 Estimated Start: Spring 2025

Estimated Completion: Summer 2025

Consultant: ISG, Inc. 

Contractor: InRoads Paving

 

Project Overview: Phase 1 of HMA resurfacing of street pavements & associated ADA sidewalk ramp improvements throughout the City.

 

Project Status: All asphalt overlays have been completed. The contractor is working on final punch list items and restoration is ongoing. 

 

Vicinity Map of Project

11/12/2025
2025 HMA RESurfacing program - phase 2 Estimated Start: Spring 2025

Estimated Completion: Fall 2025

Consultant: ISG, Inc.

Contractor: Des Moines Asphalt & Paving

 

Project Overview: This project includes Portland Cement Concrete (PCC) street repairs and hot mixed asphalt (HMA) overlays on 47th Street from Aspen Drive to Western Hills Drive, 39th Street from Stonebridge Road to Dakota Drive, 32nd Street from Vine Street to Meadow Lane, 16th Street from Vine Street to Locust Street, Locust Street from 16th Street to 9th Street, 4th Street from Vine Street to Hillside Street, Office Park Road from 11th Street to 8th Street, and South 34th Street from Scenic Valley Drive to Valleyview Drive. 

 

Project Status:  All asphalt overlays have been completed. The contractor is working on final punch list items and restoration is ongoing.

 

Vicinity Map of Project

11/12/2025
2025 PCC Patching - phase 1 Estimated Start: Spring 2025

Estimated Completion: Summer 2025

Consultant: ISG, Inc. 

Contractor: Alliance Construction

 

Project Overview: PCC patching of street pavement throughout the City.

 

Project Status:  The contractor has started full-depth concrete patching on 50th Street from Wistful Vista Drive to Mills Civic Parkway. This work will be done under a single lane closure, leaving one lane open in each direction. The work is anticipated to last 3-4 weeks, weather permitting. Full-Depth patching has also begun on 4th Street from Locust Street to Railroad Avenue. A section of one lane will be closed, leaving one lane open to the public to alternate through the construction area. This work is anticipated to last 3-4 weeks, weather permitting. 

 

Vicinity Map of Project

11/12/2025
2025 sewer cleaning and televising Program Estimated Start: Fall 2025

Estimated Completion: Spring 2025

Consultant: AECOM

Contractor: HK Solutions

 

Project Overview: This project consists of the ongoing maintenance program to clean and televise sanitary sewer lines at various locations throughout the City’s sanitary sewer collection system. 

 

Project Status: The project was awarded on October 27th, 2025. The contractor is working on a project schedule. 

 

Vicinity Map of Project

 11/12/2025
2025 street reconstruction Program (giles street, valley west drive to 32nd street) Estimated Start: Spring 2025

Estimated Completion: Fall 2025

Consultant: WHKS & Co.

Contractor: Alliance

 

Project Overview: The project involves removing and reconstructing Giles Street from Valley West Drive to 32nd Street. The existing roadway pavement will be removed and replaced with Portland Cement Concrete (PCC) pavement, which will include preparation of subbase material. Water main will be replaced, storm sewer piping will be added, sanitary sewer manholes will be modified, and some sanitary sewer services will be replaced. Affected driveway approaches will be replaced and sidewalk ramps near intersections will be modified to be ADA compliant. The project also includes surface restoration, traffic control, and other related work.

 

Project Status: The contractor has extended the closure of Giles Street between Valley West Drive and 32nd Street. The contractor has finished storm sewer instillation, subgrade prep, and paving between 34th Place and 32nd Street. No through traffic on Giles will be allowed until the remainder of the project has been completed. Installation of the sanitary sewer is complete between Valley West Drive and 34th Street. Storm sewer and water main installation is ongoing. The contractor will begin subgrade prep the week of November 10th, with paving to follow. All properties may be accessed by parking on 33rd Street, 34th Street, and 34th Place with pedestrian access being maintained through the construction zone during the project.

 

Vicinity Map of Project

Project Video

Drone flyover of the Project

11/12/2025
2024-2025 median renovations Estimated Start: Spring 2025

Estimated Completion: Fall 2025

Consultant: WHKS & Co.

Contractor: I-80 Concrete

 

Project Overview: Median renovations at various locations throughout the City. Renovations include concrete median repairs, resealing of joints, sealing of stamped concrete, and sealing of limestone blocks.

 

Project Status: The median renovations on Mills Civic Parkway from 60th Street to Stagecoach Drive and the median on South 68th Street are complete. The contractor is working on final punch list items and restoration is ongoing.  

 

Vicinity Map of Project

11/12/2025
2024 channel repair Program Estimated Start: Spring 2025

Estimated Completion: Fall 2025

Consultant: WHKS & Co.

Contractor: JC Midwest Services

 

Project Overview: This project involves repairing deteriorated storm sewer infrastructure, repairing impaired streambanks, and protecting public infrastructure at different locations throughout the City. Work includes removing and replacing/resetting new pipe and apron sections. Work also includes concrete repairs to a pipe culvert, replacement of an intake structure, and adjustment of an existing manhole. Streambank repair includes excavation and placement of revetment stone to reinforce and inhibit further erosion of the streambank areas adjacent to public infrastructure.  Associated site work improvements include erosion controls, clearing and grubbing, surface restoration, seeding, removal and replacement of sidewalk, and other related work.  

 

Project Status: All location have been completed. The contractor is working on restoration and punch list items.

 

Vicinity Map of Project

09/08/2025
2024 PCC Patching - Phase 2 Estimated Start: Spring 2025

Estimated Completion: Fall 2025

Consultant: ISG, Inc.

Contractor: Skol Trucking

 

Project Overview: This project will include approximately 172.5 Linear Feet (LF) PCC curb and gutter replacement, 170 Square Yards (SY) of 7” Reinforced PCC Full Depth Patching, 1,495 SY of 8” Reinforced PCC Full Depth Patching, 1,845 SY of 9” Reinforced PCC Full Depth Patching, 832 SY of 10” Reinforced PCC Full Depth Patching, Intake Adjustments, Manhole Adjustments, Sidewalk reconstruction, Traffic Control, and other miscellaneous work within the City of West Des Moines, Iowa.

 

Project Status: This project is substantially complete. The contractor is working on final punch list items and restoration is ongoing. 

 

Vicinity Map of Project

11/12/2025
 

PARKS & RECREATION PROJECTS

For more information on Parks & Recreation Projects:
WDM Parks & Recreation Department, City Hall
4200 Mills Civic Parkway, Suite 1B
P.O. Box 65320
West Des Moines, Iowa 50265
Phone: 515-222-3444
Email:
ParkRec@wdm.iowa.gov

 

RACCOON RIVER GREENWAY BOAT ACCESS

ASHAWA & WILD ROSE PARK PLAY EQUIPMENT REPLACEMENT

1ST STREET TRAIL

CROSSROADS PARK SKATE FACILITY

RACCOON RIVER PARK TRAIL RECONSTRUCTION

SCENIC VALLEY PARK TRAIL CONNECTION

VALLEY VIEW PARK MAINTENANCE BUILDING, SHELTER, RESTROOM, AND CRICKET HITTING CAGES

SOUTHWOODS PARK DISC GOLF COURSE EXPANSION

SUGAR CREEK GREENWAY TRAIL - PHASE 2

HIDDEN POINT PARK BALL FIELD BACKSTOP

Project  INFORMATION UPDATED
RACCOON RIVER GREENWAY BOAT ACCESS

Estimated Start:  Fall 2024

Estimated Completion:  Fall 2025
Contractor: CTI, Inc.

Project Overview: Project location is identified as a water access point in the Iowa Confluence Water Trails (ICON) master plan and will further expand recreational access to the Raccoon River. Proposed improvements will include a parking lot, access drive, site signage, paved river access along, native plantings, and a portable restroom with enclosure.

 

Project Status: Project work is 99% complete and is planned to be accepted at the 10/6/25 City Council Meeting. The contractor still needs to perform various site restoration/landscaping items, which may run into spring, 2026. After project acceptance the land will be transferred to the Polk County Conservation Board at the 10/20/2025 City Council meeting.

 

Vicinity Map

 

10/1/25
ASHAWA & WILD ROSE PARK PLAY EQUIPMENT REPLACEMENT Estimated Start:  Spring 2025

Estimated Completion:  Fall 2025
Contractor: MPS Engineers, PC

Project Overview: Construction of Ashawa and Wild Rose Parks Play Equipment, including all materials, labor, and equipment necessary for site demolition/preparation, sediment/erosion control, and construction of new playgrounds at each park site in the same location as the existing playgrounds. Improvements include, generally: removal/replacement of some PCC walks, drives and curbs, removal/replacement of play equipment, PIP rubber and rubber tile playground surfacing, PCC beam curbs, site amenities, sod/plantings, and all other associated work to complete the playground replacement projects as noted in Contract Documents.

 

Project Status: Both Wild Rose and Ashawa Parks have the play equipment constructed. Ashawa's safety surfacing is complete and Wild Rose will be getting its safety surfacing installed the week of October 27. Playground equipment auditing and inspection including surfacing testing will occur soon there after. Until then, the playground will remain closed. Site restoration including amended soils, seeding, sodding, and tree plantings are planned to occur in the latter half of October with the estimate final completion date of October 31.

 

Vicinity Map

 

10/24/25
 1ST STREET TRAIL Estimated Start:   Spring 2026

Estimated Completion:  Fall 2026
Contractor: To be determined

Project Overview: This project consists of the installation of new 10' wide concrete trail that connects from the northwest side of the 1st Street (Highway 28) bridge over the Raccoon River north to Lincoln Street, connecting to the Levee Trail. Project also includes an alternative bid item to provide a new, 10' wide trail that parallels the 1st Street River Access entrance drive from 1st street to the parking lot.

 

Project Status: Trail design and permitting are nearly complete. Project to be bid in fall, 2025.

 10/24/2025
CROSSROADS PARK SKATE FACILITY

Estimated Start:   Spring 2026
Estimated Completion:  Fall 2026
Skate Park Consultant: Spohn Ranch

Project Overview: After many years of use, the skate ramp structures are no longer serviceable and were recently removed by staff. Plans to hire a professional skatepark design company are in the works. Community engagement is planned as part of the design process.

 

Project Status: The skate park design process is getting underway with a site topographic survey and geotechnical borings being completed. Design analysis and community outreach and engagement activities will follow. Community engagement and survey opportunities will likely occur in November, followed by detailed design and construction documentation. More information regarding community engagement and feedback will be posted here.

 

 10/24/2025
RACCOON RIVER PARK TRAIL RECONSTRUCTION

Estimated Start:   Summer 2025
Estimated Completion:  Fall 2025
Contractor: Concrete Connection LLC
Project Overview:  The existing asphalt will be replaced with a new concrete trail in the same general location. Other associated improvements will include drainage improvements and sidewalk patching at the entrance to the Nature Lodge and a sidewalk extension at the soccer complex to connect to the recently completed Athene Pedestrian Bridge trail connection. Project is anticipated to be completed in 3 phases starting in August and being completed by end of October. See link for map of construction phasing plan.

 

Project Status: Contractor has completed Phase 1 of project and has moved to Phase 2. The section of trail generally between the dog park and Nature Lodge is closed for construction. This phase is anticipated to be completed by end of September. 

 

 

9/8/25
     
SCENIC VALLEY PARK TRAIL CONNECTION

Estimated Start:   Spring 2026
Estimated Completion:  Fall 2026
Contractor: To be determined
Project Overview:  This project consists of a new concrete trail connection from Scenic Valley Dr. south into Scenic Valley Park along the east side of the drainage channel, connecting to the existing asphalt-paved loop trail. This trail connection not only provides better access to the park from the west, but also provides dedicated maintenance access for City Staff.

 

Project Status: Land surveying is underway with engineering and alignment to follow. Plans to contact area residents will occur after project feasibility is determined. Bidding is planned to occur in winter, 2026 with construction to follow in the spring, 2026.

 

Vicinity Map

 

10/24/25
 2026 SPORT COURT RENOVATIONS Estimated Start:   Spring 2026

Estimated Completion:  Fall 2026
Contractor: To be determined
Project Overview:  This project consists of the asphalt resurfacing of the following park courts: Maple Grove Park tennis and basketball (includes new hoops), Wild Rose Park basketball (includes new hoops), Valley View Park tennis and basketball. Valley View's Pickleball Courts will also receive some crack sealing. The sand volleyball courts at Valley View will also see some improvements to help control sand erosion and the cricket pitch in the open field will be enlarged to accommodate play use.

 

Project Status: Land surveying is underway with engineering and design to follow.

 10/24/25
VALLEY VIEW PARK MAINTENANCE BUILDING, PICKELBALL SHELTER, RESTROOM and CRICKET HITTING CAGES Estimated Start:   Summer 2025

Estimated Completion:  Spring 2026
Contractor: Munro Construction Company
Project Overview:  Work will include construction of an open-air shelter with restroom facilities, a small maintenance building to store field maintenance and programming equipment, and a pair of dedicated outdoor cricket practice cages. The shelter and restroom building will be located immediately east of the pickleball court complex. The maintenance building will be located just north of the tennis courts and the cricket practice cages will be located on the NE corner of the central lawn area.  

 

Project Status: Contract has mobilized to site and started construction. 

 

Vicinity Map

 

7/21/25
SOUTHWOODS PARK DISC GOLF EXPANSION

Estimated Start:  Summer 2022
Estimated Completion:  Summer 2023
Contractor: 
Project Overview:  Expansion of disc golf course from current 9-holes to 18 holes. 1st phase will consist of clearing of underbrush within new fairways. Future phases will involve setting of new tee pads and baskets and wayfinding signage. 

 

Project Status:   Course is open to the public and permanent course signage has been completed.

 

9/27/24
SUGAR CREEK GREENWAY TRAIL - PHASE 2 Estimated Start:  Summer 2025

Estimated Completion:  Fall 2025
Contractor: MB Lawncare LLC

Project Overview:  This project consists of construction of a 12-foot wide reinforced PCC trail
from Stagecoach Drive north approximately 2,100 ft to the end of the Courts at Kings Landing Development. Associated work will include two short sidewalk connections to the Kings Landing neighborhood to the west, bench seating locations and final site restoration consisting of native grasses and mowed turf grass.

 

Project Status: Contractor has completed grading and utilities. Paving of trail is anticipated to begin week of September 15. 

 

For additional information see attachments:

Vicinity Map

Sugar Creek Greenway Trail - Phase 2 Alignment

Sugar Creek Greenway Trail - Phase 2 Restoration Plan

 

 9/8/25
eNotification Signup | Change eNotification Preferences
Please correct the fields below:
To change your eNotification preferences, please submit your email address. You will be sent a link to change and confirm your preferences.